Mechanical, Electrical & Plumbing Services

Mechanical & Electrical Installation
Mechanical and electrical installations are checked applying industry standards testing meters and manual pressure test equipment. The process is scheduled at an appointed time and having the QC inspector in attendance.
Each pod will be issued with a test certificate and a copy will be made available on site along with the delivery note.
Aesthetic touch-up will be made prior to intensive cleaning procedures in preparation for a pre-delivery inspection (PDI).
Water Supply Pipework
The Modulor bathroom pod is constructed will all the required water supply pipework which includes all terminal fixings as well as hot and cold water source pipework. A single pair of hot and cold manifold would be installed and it will supply the whole pod.It will be located on a specific location agreed upon.
Main isolation valve will be supplied to each manifold in accordance to set standard.
Projects
02 Nov, 2017
Zaya Nurai Island is an award-winning luxu...
18 Oct, 2016
Phase II of the project which includes the 4th, 5t...
23 Oct, 2016
Aloft hotels offer a forward design and tech-savvy...
23 Oct, 2016
Development next to Hazza Bin Zayed Hospit...
MODULOR
Visitors: 230726