ATLANTIS HOTEL, THE PALM, DUBAI, UAE

Client: KERZNER ISTITHMAR LTD
No. of Pods: 1,267
Status: Completed

The Benefits:
  • Early cost certainty was guaranteed to the client.
  • Over 900 men removed from site activities as a result of offsite manufacturing of pods.
  • 6 week early opening, affording potential project preliminaries saving and early revenue stream.
  • 95% reduction in site re-works.
  • Improved health and safety performance.
  • Bathroom Pods manufactured in a controlled factory environment for the first time in the UAE.
  • The pre-fabricated pods were installed at a rate of 38 units per week which effectively reduced the onsite trade skill requirement.
Projects
02 Nov, 2017
Zaya Nurai Island is an award-winning luxu...
18 Oct, 2016
Phase II of the project which includes the 4th, 5t...
23 Oct, 2016
Aloft hotels offer a forward design and tech-savvy...
23 Oct, 2016
Development next to Hazza Bin Zayed Hospit...
MODULOR
Visitors: 230730